Marine Link
Thursday, May 14, 2026

News: Cal Dive Riser System Deployed in Deepwater Project

Maritime Activity Reports, Inc.

November 24, 2003

Well Ops, Inc., a subsidiary of Cal Dive International, Inc. had the successful first application of the company's purpose-built, open water intervention riser system. Cal Dive's well intervention vessel, the Q4000, deployed the system in 1,042 ft. of water, where it was latched to a horizontal Cameron tree. The system includes a control umbilical, two-in. annular line, 7.375-in. flowhead and swivel.

The riser system was integral to a successful well decommissioning operation conducted for a major client in the Gulf of Mexico. The system remained at depth during through-tubing zonal and annulus abandonment operations. The tree was recovered with the system once the well had been safely plugged.

Trite but true, the path to decarbonization has no ‘silver bullet’ solution.
Read the Magazine

Fuel for Thought

Ship Managers Step Up with Plans for Stability

Subscribe for
Maritime Reporter E-News

Maritime Reporter E-News is the maritime industry's largest circulation and most authoritative ENews Service, delivered to your Email five times per week